16.0 Delivery Structure
16.1 Folder Structure

- The folder structure must not contain extraneous folders or files at the uppermost three levels, with the exception of transmittal files which may reside at the level of <Project Unique ID> or <Survey Unique ID>.
- Unused (i.e. empty) folders must be deleted prior to submission.
Table 16.1.0 Variable Folder Names
| Folder | Note |
| <Project Unique ID> |
|
| <Survey Unique ID> |
|
| <TECSOU> |
|
| <Processed data format> |
|
| <Processing project> |
|
Table 16.1.1 TECSOU Folder Names
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
16.2 Naming Conventions
<Project Unique ID>/<Survey Unique ID>/Metadata
Table 16.2.0 Metadata File Names
| Outline | |
|
|
|
|
|
|
|
|
| WKT | |
|
|
|
|
<Project Unique ID>/<Survey Unique ID>/Raw
- Raw file naming conventions must adhere to manufacturer recommendations.
- No further naming requirements are specified by the Office of Coast Survey.
- See Raw Data for common raw data file type examples.
<Project Unique ID>/<Survey Unique ID>/Processed
Table 16.2.1 Processed Data File Names
|
|
|
|
| Features | |
| <Survey Unique ID>_FFF |
|
| <Survey Unique ID>_SSS_contacts |
|
| Grids | |
| <Survey Unique ID>_<TECSOU>_<Resolution>_<Vertical datum>_<#of#>* |
|
| * The trailing number in #of# must be the total number of bathymetric grids associated with the Survey Unique ID. | |
| Mosaics | |
| <Survey Unique ID>_SSSAB_<Resolution>_<frequency>kHz_<#of#>* |
|
|
|
|
|
|
|
|
|
|
|
| Offsets |
|
| * Not required for submission in this location if offsets are captured within submitted data file(s) or the processing project. | |
| Positioning |
|
| SVP |
|
| Vertical_Datum_Correction |
|
Supplemental Survey Findings Reports
- Submitted directly and not included in Folder Structure.
Table 16.2.2 Supplemental Report File Names
|
|
|
|
|
|
|
|
|
|
| <Survey Unique ID>_Bridge_Clearance.gpkg | H12345_Bridge_Clearance.gpkg |
|
|
|
|
| <Survey Unique ID>_Weekly_Report_<YYYYMMDD>_<YYYYMMDD>.json* | H12345_Weekly_Report_20240929_20241006.json |
| * The first date must be the start of the reporting period, and the second date must be the end of the reporting period. | |
| <Project Unique ID>_<YYYY><MM><DD>_<#of#>.<bag/csar/tiff> | OPR-A123-KR-23_20230730_1of1.tiff |
| <Project Unique ID>_Final_Progress_Report_<YYYY><MM><DD>.pdf | OPR-A123-KR-23_Final_Progress_Report_20230830.pdf |